Yantai/August 14, Jereh and Wanrui Natural Gas
secured a helium extraction EPC project from boil off gas (BOG) in
Erdos, Inner Mongolia, which manifests that Jereh has furthered its
business layout in the gas industry.
Jereh and Wanrui secured a helium extraction EPC project in Erdos, Inner Mongolia.
The
project aims to obtain, purify and refine helium through cryogenic
separation technology that will produce high-purity helium and liquefied
helium, realizing the commercialization of helium resources. Compared
to traditional method, the innovated technology features low energy
consumption and high added-value.
Helium is essential for
industrial use including cryogenics, aerospace, military science,
optical-fiber electronics, high-end equipment manufacture, medicine and
etc. The only viable source of commercial quantities of helium is that
trapped within natural gas deposits. Extraction of helium from gas
sources containing more than 0.05 % (vol) helium has been proven
economical.
The whole project is expected to be put into
use by the end of 2021 with an estimated annual output value of 8.7
million USD. It is going to enhance the capabilities of helium
extraction and utilization, bringing both economic and social benefits
to the local area.
Jereh-Wanrui natural gas liquefaction project.